Store solar energy
Frequently asked questions
Our 'Battery vision' system, consisting of the individual components 'Inverter vision' 'Battery vision pack and top pack' and 'Meter', can initially be operated maintenance-free; there are no mandatory requirements for maintenance work to be carried out to preserve their function.
However, the products are electrotechnical components that can be checked for safety and function as part of a recurring inspection of electrical systems or must be checked in public buildings. The term 'maintenance services' in the Solarwatt warranty conditions is to be understood in this context. In this case, the note for maintenance work in the online manual of the product applies: 'Only qualified installers who have been trained by Solarwatt may carry out service and maintenance work on Battery vision.'
https://www.solarwatt.co.uk/manuals/solarwatt-battery-vision/legal/safety-instructions
The maximum length is 100m.
We officially recommend the use of a shielded cable with twisted pairs for RS485 communication, e.g. LIYCY (TP) 2x2x0.34 mm² for indoor use, and for outdoor use a UV and weather-resistant equivalent cable that complies with the required IP protection class IP65. However, using two cores of a high-quality CAT5e Ethernet LAN cable will also work - just make sure to use a cable tester to check the pin outs before running the cable!
SOLARWATT does not offer a wall bracket for Battery vision.
The battery must be placed on a stable solid surface and fixed to the wall with the included wall brackets (which secure the tower to the wall, but are not load bearing). Please observe the specified clearances:
https://www.solarwatt.co.uk/manuals/solarwatt-battery-vision/installation/installing-battery-vision
Solarwatt accepts no responsibility for individually created stands or brackets etc.
It is not possible to charge the battery in backup mode via an AC generator connected to the AC connection of the inverter. In backup mode, there is no mains voltage and no mains frequency, so the AC connection is switched off.
Currently, the only way to charge the battery in backup mode is via the PV modules connected directly to the vision one/three hybrid inverter.
The only requirement is that one phase must not be loaded with more than 1/3 of the rated power.
Yes.
Instructions for how to perform a black-start of the system can be found in our online operating instructions.
https://www.solarwatt.co.uk/manuals/solarwatt-battery-vision/operation/restarting-and-black-starting
Does the main AC cable have to be disconnected in this case?
The AC main (grid) cable does not need to be disconnected. The system will immediately switch back to the mains when it is available again.
No. The system must be connected to the power grid. Permanent stand-alone ("island mode") operation is not permitted.
There is no time limit for retrofitting a Battery vision tower with more packs.
However, due to the series connection of the batteries, it should be noted that the ageing process of the battery packs means that the weakest pack always determines the maximum capacity of the battery overall. This means that the later you retrofit packs, less the full capacity of the retrofitted pack can be used. Thanks to the high quality of SOLARWATT Battery vision packs and the extensive Solarwatt guarantees, these technical issues do not play a major role, especially in the first few years.
Another reason not to wait too long with a planned expansion: the product must be available for problem-free retrofitting. Constant technical developments mean that every product reaches the end of its life cycle, i.e. it is no longer produced and therefore there is no longer any possibility of retrofitting. Product discontinuations are announced several months in advance, however, so that existing customers are informed when retrofitting will be possible for the last time.
Yes, the feet are included with the Battery vision top pack, as well as a termination plug for the unused connection of the bottom Battery vision pack.
As a result, you'll need to open the Battery vision top pack box first - even though the installation starts with the bottom pack.
- Data sheetpdf download (642.2 KB)Datasheet Battery vision clusterbox en
- Data sheetpdf download (741 KB)Datasheet Battery vision backup booster en
- Brochurepdf download (3.6 MB)Brochure MyReserve 500+800
- Brochurepdf download (3.9 MB)Brochure MyReserve matrix
- Data sheetpdf download (1.1 MB)Datasheet SOLARWATT Battery vision Inverter vision three en-UK
- Documentpdf download (259.1 KB)Comparison guarantee conditions batteries
- Data sheetpdf download (2.9 MB)Datasheet MyReserve
- Documentpdf download (1.6 MB)Full-coverage registration process for MyReserve
- Documentpdf download (769 KB)Commissioning log MyReserve
- Documentpdf download (834.7 KB)Change protocol MyReserve configurator
- Data sheetpdf download (551.2 KB)Safety Data Sheet SOLARWATT Battery vision en
- Data sheetpdf download (901.8 KB)Datasheet SOLARWATT Battery flex base AC-1 en
- Documentpdf download (159 KB)Tender text SOLARWATT Battery flex - en
- Documentpdf download (536.5 KB)ADR Beförderungspapier_Battery flex pack alle Sprachen
- Data sheetpdf download (1.2 MB)Technical datasheet SOLARWATT Battery flex pack en