- Data sheetpdf download (1.3 MB)Technische datasheet SOLARWATT vision M 5.0 construct nl
- Data sheetpdf download (990.2 KB)Datasheet ESS-Aelio_en
- Data sheetpdf download (752.9 KB)Datasheet ESS Trene Air Cooled en
- Data sheetpdf download (1.1 MB)Data sheet SOLARWATT Panel vision M 5.5 style en
- Data sheetpdf download (703.3 KB)Datasheet SOLARWATT Battery vision one backup booster en
- Data sheetpdf download (703 KB)Datasheet SOLARWATT Battery vision three backup booster en
- Data sheetpdf download (1.5 MB)Data sheet SOLARWATT Panel vision L 5.5 en
- Data sheetpdf download (2 MB)Data sheet SOLARWATT Panel vision M 5.5 en
- Data sheetpdf download (1.9 MB)Datasheet SOLARWATT Battery vision Inverter vision max en-UK
- Factsheetpdf download (183.1 KB)Compatibility overview ISG Stiebel Eltron
- Data sheetpdf download (652.2 KB)Datasheet Battery vision clusterbox en
- Manufacturer declarationpdf download (94.9 KB)Manufacturers declaration Herstellererklärung Kompatibilität Inverter vision BRC products en
- Certificatepdf download (594.1 KB)Certificate G99NI - Northern Ireland - Form A2-3 Report - Inverter vision max
- Certificatepdf download (835.4 KB)Certificate G99 - England, Scotland, Wales - Form A2-3 Report - Inverter vision one (7-10 kW) - LFSM-U Addendum
- Certificatepdf download (750.9 KB)Certificate G100 - UK - Form B - Inverter vision one (7-10 kW)
Frequently asked questions
We detail everything you need to know about the return and disposal of our PV modules in our dedicated online user manual page:
https://www.solarwatt.co.uk/manuals/solarwatt-panels/disposal
Please check our online manual page which outlines what the different LEDs mean on our Manager devices:
https://www.solarwatt.co.uk/manuals/solarwatt-manager/leds-and-buttons
Please refer to the relevant manufacturers' declaration - Cutting off and replacing solar module connectors.
The complete list of devices that are compatible with the SOLARWATT Manager can be found under the following link on our online manual:
https://www.solarwatt.co.uk/manuals/solarwatt-manager/commissioning/device-connector
There are two ways to restart SOLARWATT Manager devices:
- Disconnect from power
- Restart via the EM.Setup interface
Disconnection from the power
EnergyManager pro and Manager rail:
To disconnect the power supply, switch off the associated fuse, wait approx. 20-30 seconds and switch on again
Manager flex:
Unplug the mains plug, wait approx. 20-30 seconds and plug it back in
Restart via the EM.Setup interface
Accessing the SOLARWATT Manager EM.Setup in your browser
In the 'Summary' section of EM.Setup, it is possible to restart the manager by clicking the 'Restart gateway' button.
Reactive load management involves wiring Charger vision into the CHINT Meter DDSU/DTSU included with SOLARWATT Inverter vision (also sold separately), then enabling & configuring the max. current of the household incoming in the SOLARWATT Pro app. When configured, the charger's throughput will be reactively curtailed when the total throughput of the charger and household demand from the grid would exceed that of the incoming, to prevent a blackout.
The full installation instructions are outlined in detail in our online operating instructions:
https://www.solarwatt.co.uk/manuals/solarwatt-charger-vision/installation/load-management-optional
Yes.
Instructions for how to perform a black-start of the system can be found in our online operating instructions.
https://www.solarwatt.co.uk/manuals/solarwatt-battery-vision/operation/behavior-during-a-power-cut
Does the main AC cable have to be disconnected in this case?
The AC main (grid) cable does not need to be disconnected. The system will immediately switch back to the mains when it is available again.
The following models of Charger vision are available.
SOLARWATT Charger vision (7 kW, single-phase 32A, shutter)
SOLARWATT Charger vision (11 kW, three-phase 16/16/16A, cable)
SOLARWATT Charger vision (11 kW, three-phase, 16/16/16A, shutter)
The 'cable' version of our three-phase 11 kW Charger vision includes a fixed 6m long Type 2 charging cable which is permanently attached to the charger, while the 'shutter' versions include a socket to allow the customer to insert their own Type 2, Mode 3 EV Charging cable; please note there is no cable version of the single-phase 7 kW Charger vision.
No. The system must be connected to the power grid. Permanent stand-alone ("island mode") operation is not permitted.
Our 'Battery vision' system, consisting of the individual components 'Inverter vision' 'Battery vision pack and top pack' and 'Meter', can initially be operated maintenance-free; there are no mandatory requirements for maintenance work to be carried out to preserve their function.
However, the products are electrotechnical components that can be checked for safety and function as part of a recurring inspection of electrical systems or must be checked in public buildings. The term 'maintenance services' in the Solarwatt warranty conditions is to be understood in this context. In this case, the note for maintenance work in the online manual of the product applies: 'Only qualified installers who have been trained by Solarwatt may carry out service and maintenance work on Battery vision.'
https://www.solarwatt.co.uk/manuals/solarwatt-battery-vision/legal/safety-instructions