SOLARWATT Pro app: December 2025 update now available

The v2.3.0 update for the SOLARWATT Pro app was released today for our installer partners which introduces the ability to commission SOLARWATT Battery vision clusterbox, our energy control box for the phase-balanced parallel installation of our three-phase SOLARWATT Inverter vision three system. With the clusterbox, up to 150 kW of inverter power and 182 kWh of battery storage power is now possible
With the latest update, the newest addition to the SOLARWATT vision product portfolio can now be setup straight from our installer app.
On the Pro app, you can configure whether you would like 'combined' or 'parallel' backup mode for your Inverter vision cluster array. When in combined mode, you can connect the backup UPS port outputs of up to four Inverter vision three inverters to supply loads during a power cut. In parallel backup mode, the individual backup outputs of up to ten Inverter vision three inverters may be used to supply one three-phase mission critical load sub-board each.

What's new
- It is now possible to commission SOLARWATT Battery vision clusterbox from the Pro app and set the backup cluster feature (note this is only for the Inverter vision three series)
- The icons used for products in the app have been improved
- General stability improvements and bug fixes


