SOLARWATT Manager - October 2026 Update Notes
28.10.2026
The October 2026 Manager Update provides bug fixes and improvements to device discovery and Battery Vision Clusterbox 1.0 integration.
By SOLARWATT UK & Ireland Contact
This month, we've released a new update for the SOLARWATT Manager to improve commissioning and clusterbox integration for data analytics in three phase parallel systems.
New Features and Bug Fixes
Energy management & batteries
- If meter values stop arriving, battery control is now released after 61 seconds instead of 20. Short meter data dropouts no longer interrupt battery control
- A failed connection now fails at once instead of being retried 5 times. This stops unexpected polling delays and overloading during communication problems
Device integrations
- The Battery Vision Clusterbox 1.0 has been integrated with the energy manager to provide total energy data for all connected inverts, batteries and meters
- When searching for devices in three-phase parallel systems, you simply find and install the Clusterbox, rather than every individual inverter!
EM.setup usability
- A success message now appears after a device is added manually
- The "Stop automatic search" button is disabled after the first click, so it's clear the stop was triggered


